2004
- CCL3 C852A
LOR Station
Diaphragm Wall |
||||||
|
Contact the Project Manager, CK
SIU
Diaphragm Wall The diaphragm wall for Lorong Chuan Station is particular in that it is in a very residential area and has several interesting physical constraints such as a drainage culvert running right through the site and some complex traffic management issues. Sato Kogyo have proposed a time saving alternative construction using the top down method to minimise disruption. We are using hydraulic grabs to reduce noise levels and have organised the site to ensure nuisance can be kept to a minimum.
|