2002 - CCL2 C823 OAR, TKT & PYL Stations
Diaphragm Wall & Barrettes

 

Contact the Project Director, Patrick BRAUN
Poject Manager OAR/TKT, Kusno AKBAR

Project Manager PYL, KK CHAN


Client: Land Transport Authority

Main Contractor: Nishimatsu Lum Chang JV

Diaphragm Wall & Barrette Piles: 0.6m, 0.8m, 1m & 1.2m thick; 78,000m2

This contract consist of the construction of diaphragm wall and barrette piles for three stations on the new Circle Line Stage 2 (CCL2) for the Nishimatsu Lum Chang Joint Venture. The diaphragm wall for two of the stations are temporary works (Old Airport Road and Tanjong Katong) and the third, Paya Lebar is a composite wall that will form part of the permanent structure. All the structures are in busy urban locations with traffic management considerations. Paya Lebar Station is an interchange station and is therefore complicated by being built below the existing MRT structures. Special equipment and procedures are required within a high safety culture.


Overall view of works @ Paya Lebar Station

Overall view of works @ Old Airport Road Station

Overall view of works @ Tanjong Katong Station

Installation of a reinforcement cage @ Tanjong Katong Station

Low headroom diaphragm wall under railway viaduct @ Paya Lebar Station


Installing reinforcement cage for low headroom barrette @ Paya Lebar Station

Photo credits to Joe Lynch

 