Client: Public
Utilities Board
Main Contractor: Samsung
Drilling:
1 hole 21m long horizontal core in a 2.2m diameter tunnel.
Specilaist drilling
works to investigate ground ahead of tunnelling machine.
Bachy Soletanche were called in to take a quality core through fractured
rock at the interface with Old Alluvium.
Following settlement on the surface and as
a precuationary measure in a sensitive area with complex geology,
the Main Contractor decided to undertake a horizontal core ahead of
the tunnel drive. With none of the local SI contractors able to undertake
the works, BSS were able to carry out the 21 long borehole over a
weekend thus ensuring minimum disruption to the Main Contractor.