HARVEST CHURCH, JURONG WEST
Diaphragm Wall |
|
Client: City
Harvest Church Diaphragm Wall:
5,280m2, 1.0m thick, 27m deep Diaphragm Wall for the proposed
City Harvest Church at Jurong West Street 91. The project
was undertaken using two rigs, one KS3000 and one mechanical KL grab.
Two rigs were required to assure the programme. The site was very
small for two rigs with the bentonite plant and the cage fabrication
all in the centre of the site. Additionally, with HDB flats just 10m
away from the site boundary, the environmental conditions were strict
and required the upmost attention from the Contractors. |