1999 - "E" Division Police HQ @ Kampong Java Road
Diaphragm Wall & Bored Piles

Kampong Java Police Station

Client: Public Works Department
Engineer: CMP Consultaing Engineers
Architect: Vista
Main Contractor: Koh Brothers Pte Ltd

Diaphragm Wall: 7,120m2
Thickness: 800mm
Max. Depth: 32m
Equipment - KS3000

Bored Piles:
90 Bored Piles 1,500-900mm diameter

Project Duration: 14 weeks

Diaphragm Wall and Bored Piling for a new Police Station at Kampong Java Road, adjacent to KK Womans Hospital. The notable feature of the diaphragm wall was the T panels used in areas of very poor ground to stiffen the diaphragm wall and limit the number of struts required for the excavation.

Kampong Java Cage
T panel under construction. The cage is lowered into the excavation.

 