1999 - EMPRESS PLACE, MUSEUM OF ASIAN CIVILISATION
Diaphragm Wall

Empress Place, excavation close to the existing building

Client: PWD
Architect: PWD
Engineer: PWD Consultants
Main Contractor: Singapore Piling and Civil Engineering

Diaphragm Wall:

A basement retaining wall for the new 2nd wing of the Museum of Asian Civilisation. This site was the refurbishment and extension of the old immigration building.

Empress Place, congested site, underpinning works

 


H o m e P a g e | C o m p a n y | L o c a t i o n | W o r k s | P r o c e s s e s
E q u i p m e n t | C o n t a c t s | E - M a i l